Capital Improvement Projects

2019 –
PretherBridge Neighborhood Project – 6”/ 8” Water Mains
(153rd Terr., 154th St., 154th Terr., Olive St., Ripley St. and Martha St.)

2020 –
Klamm Neighborhood Project, Phase 1 – 6”/ 8” Water Mains
(157th St., 157th Terr. and Klamm St.)

2021 –

  • Klamm Neighborhood Project – Phase 2 – 6”/ 8” Water Mains
    (155th Terr., 156th St., 156th Terr., 157th St. & Poplar St.)
  • 158th St. & Wolf Creek Pkwy – 12” Water Main
  • 158th St. & Parallel Rd – 12” Water Main
  • Water System Study

2022 –
“Old Basehor” Neighborhood Project – 6”/ 8” Water Mains
155th Terr., 156th St., 156th Terr. Ripley St. & Maple St.

Future Projects –

  • Supply Meter Improvements
  • K7 & Leavenworth Rd. North (Leav. Rd to Mitchel Ct.) – 12” Water Main
  • K7 & Leavenworth Rd. South (Leav. Rd. South ¾ mile) – 12” Water Main
  • Parallel Road (142nd St. to 147th) – 16″ Transmission Main
  • Parallel Road (147th St. to 155th St.) -16″ Transmission Main
  • Marxen Road (123rd St. to Wolcott Rd) – 6” Water Main
  • 163rd Street (Leavenworth Rd South ¾ mile)  – 12” Water Main
  • 155th Street (Fairmount Rd to Lynn Rd) – 12” Water Main
  • Elm Street (154th Terr. to 155th St.) – 8” Water Main
  • Donahoo Road (147th St. to 155th St.)  – 12” Water Main
  • Leavenworth Road (City Park to 163rd St.) – 12” Water Main
  • Leavenworth Road (163rd St. to 168th St.)  – 12” Water Main
  • Hollingsworth Road (147th St. to 155th St.) – 12” Water Main
  • K7 & Robin Rd Crossing  (Robin Rd to McIntyre Rd)  – 12” Water Main
  • E. Mary St./Stranger Road (Wolcott Rd, W ½ mile) – 8” Water Main
  • 163rd Street (Leavenworth Rd North ¼ mile) – 8” Water Main
  • Wolcott Road  (123rd St. to Marxen Rd) – 6” Water Main
  • McPherson Road / 119th St. – 6” Water Main